Standard: 24-hr. Production Tracking
December 1, 2007Comments
![]() |
A 24-hr. graph shows real-time production with actual number of parts produced, parts per minute and average parts per minute. The graph shows up- and downtime with time-stamped press faults at downtimes. These are put into a fault history for viewing at a later date. Customers that wish to create reports can download information to a PC using the CieconetII optional software, or can use the standard USB port on the operator interface to store the data on a USB disc without any optional software required.
Cieco Inc.: 412/262-5581; www.ciecocontrols.com
See also: CIECO, Inc.
Technologies: Quality Control
Comments
Must be logged in to post a comment. Sign in or Create an Account
There are no comments posted.Online GD&T Training
Tuesday, October 29, 2024
Management
Daniel Schaeffler Friday, October 27, 2023
Use Lean Six Sigma for Efficiency & Quality Improvement
Daniel Schaeffler Friday, October 27, 2023

Seeking Small Victories: Continuous Process Improvement
Daniel Schaeffler Monday, September 25, 2023
An Introduction to Quality Management Systems
Daniel Schaeffler Thursday, July 27, 2023