Page 15 - MetalForming April 2013
P. 15

                     59 STANDARD- BENCH Models
and Growing!
2-40 Ton
MCB Standard Non-Rotation RAM
M2PB Two Post Guided Tool Plate
M4PB Four Post Guided Tool Plate
MGB GIB Guided Tool Plate
MCC Compact Economy Model
96 S T A N D A R D FLOOR Models
and Growing!
4-250 Ton
MCF Standard Non-Rotation RAM
M2PF Two Post Guided Tool Plate
M4PF Four Post Guided Tool Plate
MGF GIB Guided Tool Plate
                     -                                         

   of 2D and 3D height gauges and other fixture and layout equipment. The firm also operates application centers in Los Angeles, CA, and Cincinnati, OH.
Service Center Launches Web- Based Material-Test Reporting
Central Steel & Wire Co., Chicago, IL, has begun to provide customers with material-test reports online. The firm operates stoking facilities in Chicago, Cincinnati, OH, Detroit, MI, Milwaukee, WI, Greensboro, NC and Portage, IN.
Governor Attends Hypertherm’s Grand Opening
The ribbon was cut on March 4 to inaugurate the new 160,000-sq.-ft. home of Hypertherm, Hanover, NH, and among those in attendance was New Hampshire governor Maggie Hassan. The new LEED (leadership in energy and environmental design) certified facility includes advanced R & D space, training classrooms and engineering labs. Hyper- therm manufactures equipment and
software for laser, waterjet and plasma- arc cutting.
Novi Welcomes Inspection- Fixture Manufacturer
Carl Zeiss Industrial Metrology, Maple Grove, MN, has opened a new Carl Zeiss Fixture Systems facility in Novi, MI. The facility will manufacture inspection fix- tures for automotive stampings, body-in- white assemblies, rails, closures and other applications. The group has opera- tions in North America, Europe and Asia.
Robot Duo Stars in Fabricator’s New Welding Cell
D&S Manufacturing, a custom manu- facturer of large-scale components and assemblies for Caterpillar, Oshkosh Corp. and others, has added a new dual- robot arc-welding cell to its plant in Black River Falls, WI. The cell, developed and integrated by Wolf Robotics, Fort Collins, CO, features two ABB six-axis robots, a pair of Lincoln Electric welding power supplies and a servo-driven twin-
News Fronts
   Fabricating Manufacturers
TRUST Global Shop for ERP Success.
 “Global Shop has made us a much more efficient operation and has allowed us to produce more parts and maintain our on-time delivery at a high rate.”
Eric Miller, Miller Welding and Machine
   Use Global Shop Solutions ERP software. Before you know it, you’re saving thousands of dollars. Year after year. Just like our many successful fabrication manufacturing customers.
For a FREE copy of Global Shop’s ROI brochure, visit www.GlobalShopSolutions.com or
call 1.800.364.5958.
                Designed to StreamlineTM
©2013, Global Shop Solutions, Inc.
   www.metalformingmagazine.com
MetalForming/April 2013 13




























































   13   14   15   16   17